Wall cladding requires dabs of silicone
every 8”-10” (20-25cm) across and down.
Be sure the backs of the sheets are clean
and dust free.
When
vertical hard seams are requested such as
a back wall or tub surround, it is recommended
to bond the panels together horizontally
and float them up into place.
An alternative to bonding vertical seams
might be to have beveled edges with silicone
seams like real stone. For best results,
use the Wavy Bit System to keep the panels
aligned.
Vertical installations over 10’ (304.5cm)
in height may need mechanical fasteners.
Back splashes require dabs of silicone every
8”-10” (20-25cm). The use of hot melt glue
can help hold the splash in place until
the silicone has set.